8018

SHPPs Jorge Dreher and Henrique Kotzian CDM Project

From USD 1.00 Available tonnes: 172,299
The power plant supplies electricity to Brazil's National Interconnected System, displacing thermal electricity sources from fossil fuels. It also contributes to environmental sustainability, to meet the growing energy demand on Rio Grande do Sul state, and to decrease external energy dependency.

4229

Project for the reduction of greenhouse gas emissions…

From USD 2.50 Available tonnes: 194,746
Hydro projects generate electricity from flowing water. They reduce the need to burn fossil fuels to generate our power. Project benefits: preserving natural resources; promoting renewable energy generation; reducing dependency on non-renewable resources; helping spread green technology worldwide; and improving health.

4676

Malagone SHP CDM Project, Minas Gerais, Brazil (JUN112…

From USD 1.00 Available tonnes: 19,810
Malagone is a run of river small hydro project located in Minas Gerais, Brazil. It has an installed capacity of 19 MW. The project feeds the National Interconnected Grid System with renewable sources of electricity, helping to meet the growing demand of energy in Brazil.

2793

Santana I SHP CDM Project (JUN 1118)

From USD 1.50 Available tonnes: 47,108
The project generates electricity from a renewable source. Unlike large hydroelectric facilities, Sanatana I, a plant with an installed capacity of 14.75 MW, has virtually no environmental impact. This project uses natural resources efficiently and contributes to sustainable development in Brazil.

9111

7 MW Bundled Hydro power project at Himachal Pradesh o…

From USD 0.70 Available tonnes: 943
The project activity involves generation of electricity by using the available hydro potential in the tributaries of the Ravi River and exporting the generated electricity to the Himachal Pradesh State Electricity Board (HPSEB).

1265

Chile: Quilleco Hydroelectric Project

From USD 5.00 Available tonnes: 19,861
Quilleco is a run-of-river hydroelectric plant with an effective installed capacity of 70 MW, which uses the waters of the Laja River Basin to deliver energy to the National Electrical System equivalent to the consumption of more than 162,000 people.